How can we help you?
How ForensicBIM values IFC model data, how the audit and the numbers are built, and how your files are kept secure. Practical guides for file limits and the 3D viewer are at the bottom.
Start here
3 key articlesWhy BIM data is worth less on the balance sheet than the industry thinks
Accounting rules start from cost, not expected savings, and model data has no second-hand market. What that means for the carrying amount, with worked examples under IAS 38, GASB 51 and RJ 210, and how the rules compare across Germany and other EU countries, the UK, the US, Japan, China and Australia.
Valuation methodology: how the numbers are built
What is being valued, the accounting and valuation standards behind it (IAS 36, IAS 38, IFRS 13, IVS), how estimates are calibrated against expert judgement, and how their accuracy is checked.
Encryption: how, where and what we encrypt
TLS 1.3 in transit, AES-256 at rest in the storage region you choose, SHA-256 integrity checks on every uploaded file, and customer-managed keys for Enterprise.
No matching articles
Nothing matches that search. Try a broader term, or clear the search to see every article.
Valuation & accounting
12 articlesWhat the numbers mean, and how model data can be recognised and capitalised on the balance sheet.
Executive guide to the value of BIM data
A strategic guide for CFOs, controllers, and executive leadership on understanding, defending, and accounting for the value of building models. Three regional PDF editions for Europe, the US, and Global jurisdictions.
Choosing the useful life of model data
How to choose the useful life of model data in the report (5 to 30 years for buildings, up to 50 for infrastructure), what it changes in amortisation, carrying amount and savings, and how to make the choice supportable to your auditor.
Combining the files of one asset
How the files of one building or structure are valued as one data set: how files relate, what each counts for, why the asset is worth less than the sum of its files, and what the alignment check says about a delivery.
Sending the balance sheet pack to your finance department
What the memo, workbook and evidence file hold, how your finance department imports the asset and posts the entries, and how an auditor verifies a pack.
4 ways to raise the balance sheet value of your BIM data (and which ones work)
Cost allocation, digital twin platforms, licensing and acquisitions, each rated: which raise the carrying amount, which only raise economic value, and how to reach an amount your auditor will accept.
The eleven numbers: the data value ladder
The eleven quantities that get called ‘the value of the data’, from reproduction cost to carrying amount. Cost side versus utility side, deprival value, and when data can be recognised on the balance sheet.
Operate & maintain savings: what the Savings page measures
How the data in a file saves the owner time in operation, why the yearly saving goes up and down, what O&M data readiness means, and which costs are left out.
Value at stake: what losing the data would cost
The four measured parts (re-survey, survey gap, concealed items, decisions taken without the data), the build cost, works share and error share you can set, and why the ranges are likely ranges.
Which number answers which question?
A decision guide for asset owners, controllers, BIM managers and auditors: which figure to use for the balance sheet, an impairment test, a maintenance budget or a rebuild estimate.
Why ForensicBIM works with IFC
IFC (ISO 16739) stays readable for decades. Proprietary formats carry ongoing licence costs and can drop to zero value once the software stops supporting them.
Does AI change the value of IFC data?
Why faster recreation with AI doesn’t change the carrying amount, where the value in operations sits, and why AI depends on reliable data. Includes the Waternet Amsterdam case.
ForensicBIM and the EU BIM Task Group CBA method
How the EU cost-benefit handbook’s pre-tender estimates relate to ForensicBIM’s audit and valuation of the IFC files actually delivered.
Methodology & checks
28 articlesWhere the figures come from, how sure they are, and what the audit checks in every file.
The quantity check: do the Qto values match the model?
How forensicBIM compares every declared volume, area, length and dimension with the object’s own geometry, and what unit errors and measuring rules look like.
Benchmark: peer groups and percentiles
How a file is compared with similar models: peer groups by facility type, size and discipline, what a percentile means, and what a benchmark release is.
Geometric weight and the density heatmap
What triangles per object say about a model, how the weight is scored, how to read the density heatmap, and how to make a heavy model lighter.
How we measure size, and which units you see
How the size of the asset is measured from its geometry, and how the file’s units and your units setting decide what you see.
Georeferencing and the location map
How the audit checks where a model sits in the real world, the problems it detects, and how to read the location map.
Scoring versions and what changed
What changed in each scoring version, and what a new version does to your reports and to the benchmark.
The alignment check: structure and continuity
How forensicBIM tests IFC 4.3 alignments for roads, rail and bridges: design layout against geometry, gaps at every joint, and the buildingSMART alignment rules.
The risks of complex IFC geometry types
Why geometry can follow the IFC standard yet still fail on import, why data gets lost, and why forensicBIM measures downstream risk rather than mere validity.
Elements without geometry, shape reuse and copy-pasted geometry
Which elements have no shape or one that can’t be processed, how repeated objects share one definition or get copy-pasted, and which quantities have nothing behind them. How each check is scored.
Methodology overview: data, experts and standards
The benchmark of real IFC models, the expert reviews, the savings research and the accounting standards behind every score, valuation range and savings estimate.
What we check, and why
Around 50 automated checks across validity, structure, geometry, information and consistency, plus official buildingSMART validation, georeferencing, the 3D viewer and the geometry heatmap.
How sure is the estimate? Statistical confidence explained
What the confidence figure on the valuation page measures, why it doesn’t move when you change the hourly rate, and how to raise it.
What’s in the hourly rate?
What a blended rate is made of (wages, employer contributions, software licences, overheads) and which of those costs each accounting standard lets you count.
Proxies: when they are acceptable and how to make them say what they are
Why a file of generic proxies can pass the buildingSMART validation and still be unusable to an owner, when proxies are acceptable, and how classification with a URI makes them say what they are.
Passing the buildingSMART validation is not the same as good data
A file can pass the buildingSMART validation service and still be all unclassified proxies without properties. What the eight validation topics check, how forensicBIM scores them, and which checks show whether the data can be used.
Classification in IFC: systems, references, URIs and bSDD
How classification is stored in IFC, how the report checks coverage, real systems, complete codes and URIs, and what the bSDD capability asks for.
Which objects need a classification, a material and properties
Why furniture, vegetation, openings, spatial containers and virtual elements are left out of the coverage figures, how assemblies, rebar and fittings are treated, and how the rules move the scores.
Property sets: standard sets, custom sets and empty values
How the report judges properties: effective facts, standard Pset_ and Qto_ sets and their compliance, custom sets with URIs, empty values and disguised missing values.
Materials in IFC: coverage, hygiene and names
Which elements need a material and how coverage is measured, how placeholder, unused and near-duplicate materials are scored, why assemblies are left out, and what materials make possible after handover.
Spatial structure and containment
How an IFC file should organise a building, bridge, road or tunnel from project and site down to storeys or facility parts, and how the Structure page scores containment, hierarchy, sites and warnings.
Spaces: closed volumes, room areas and virtual boundaries
Whether room volumes are closed, whether the room areas in the quantity sets are plausible, and whether virtual boundaries between open-plan spaces stay virtual. Why it matters for floor areas, energy and facility management.
File header, model view definitions and schema version
What the IFC file header records, how forensicBIM reads the schema version, the model view definition (MVD), author, organisation and timestamp, and which checks score them.
The Forensic BIM score™ and its grades
How the Forensic BIM score™ is built from four data factors (completeness, richness, reliability, semantics), what grades A to E mean, and why it limits the Overall quality score. A data-quality score, not a valuation.
GlobalIds: why duplicates break handover and operations
What an IFC GlobalId is, how forensicBIM counts and scores duplicate GlobalIds, and why duplicates break asset registers, CMMS and CAFM links, BCF issues, version comparison and federation.
Names: placeholder, missing and overly long names
Which names count as placeholders or missing, when a name is overly long or symbol-heavy, how both checks are scored, and why names matter for finding assets in operation.
Overall quality, Forensic BIM score™ and interoperability risk: three questions about one file
What each of the three judgements at the top of the report measures, why they are kept apart, how to read them together and which one answers your question.
Interoperability risk: what can go wrong when someone imports your file
What the traffic light on the Scores page means, the four steps it checks, why a valid IFC file can still lose or move information on import without anyone noticing, and what to do at each level.
Capabilities: what a file is ready for
The capabilities an IFC file can earn (shown on the Capabilities page of every report), the rule behind each one, and how to share them in your showcase.
Security & privacy
4 articlesWhere your files are stored and processed, which controls protect them, and what happens when you delete them.
How we improve with data
Your IFC files are encrypted, processed only by automated scripts in your region and never opened by a person without your permission. The three privacy settings explained, and what deleting a file does.
SOC 2 and ISO/IEC 27001: where we stand
The controls we run, how they map to SOC 2 and ISO/IEC 27001, and what an independent audit has not yet confirmed. Policies and evidence are available on request.
Trust centre: data residency and GDPR
Files are stored and processed only in the region you choose: the Netherlands, Iowa, London, Singapore, Hong Kong, Sydney, Tokyo or São Paulo. Plus our NIST CSF 2.0 alignment and approach to GDPR.
Privacy: deletion, retention and model reuse
What deleting an analysis or your account removes, how long records are kept, and how to opt out of model reuse in Settings.
Platform & support
6 articlesUploading files, using the 3D viewer, plans and pricing.
How to read your report
A tour of the report: the menu, the Overview, Scores, Capabilities and Benchmark pages, the value and dimension pages, the checks, and what you can download or share.
Frequently asked questions
Short answers on files and analysis, scores and valuation, privacy, sharing, downloads and deletion.
File size limits and memory use
The 5 GB upload limit, the 32 GB memory ceiling, how to get larger files processed on Pro, and export settings that keep IFC files lean.
3D viewer or map not loading? Enable WebGL in Chrome
Turn on hardware acceleration, fix ANGLE errors on macOS, and test without extensions or in another browser.
Plans and pricing
What the Free, Pro and Enterprise plans include, and the 14-day money-back guarantee on Pro.
Our offices in Amsterdam and New York
The Rock on Amsterdam’s Zuidas and 48 Wall Street in New York. Visits are by appointment.
Can’t find what you need?
Our IFC and valuation specialists answer questions by email, including requests for larger files, custom reports and Enterprise set-ups.