IFC model audit & valuation

Your project delivered a digital asset. Know what it's worth.

ForensicBIM audits the model data you received and gives it a carrying amount, so you can recognise it on your balance sheet and budget to maintain it. It also estimates the potential savings and gives suggestions for improvements to maximise it.

Examine your IFC file
3D model of a critical pump station, as delivered critical_pump_station.ifc Forensic scan
What 130 of these models are worth 130 STATIONS
On the books
€341k
130 × €2,621, if recognised
Worth in use
€11M–€16M
value in use today
Undervalued
32–46×
use vs. book
78% undergroundGetting the data right before handover costs €96–132k for all 130. Once it’s lost, getting it back means digging: €4.2–5.8M.
Actual project: 130 pump stations, scaled from the scanned one. Published with permission of the client.
In short · page one of every report

Accept it, pay for it or send it back? Straight answers, in minutes.

Before a single score or chart, every report answers the questions that decide what happens to a model. In plain words, colour-coded, and each answer backed by the checks behind it.

  • Yes, careful or not yetNo scores to interpret, no BIM jargon.
  • Every answer traceableClick it and see the checks that decided it.
  • A fix list to send backBlockers first, then the biggest gains.
  1. Will popular software open it?Some riskSome risk: IFC schema invalid (forensicBIM check, buildingSMART rules): most software still opens the file, but some may refuse it or interpret parts of it differently
  2. Is it valid IFC?Not yetIt breaks the buildingSMART IFC rules (checked by forensicBIM) and its property sets break the IFC rules in 638 places
  3. Is the alignment reliable?Not yet1 of the 3 alignments have gaps between their segments
  4. Is anything broken?4 thingsFour things will break or go missing
  5. Can it be the legal document? MALDNot yetNot as delivered: three blockers, each enough on its ownOnly in ForensicBIM
  6. What do we send back to the author?3 fixes firstClose the gaps in 1 alignment, correct the property sets, re-export the file so it reads cleanly
+ 7 more answers: content quality, library, what’s in it, line-up with your assets, quantities, life span and price
Only in ForensicBIM

Can this model be the legal document?

Transportation agencies are moving from drawings to the model as the legal document (MALD). Before anyone signs off, ForensicBIM tells you whether anything technical stands in the way, and why.

  • Valid IFC
  • Alignments without gaps
  • Placed correctly on the map
  • Every element has geometry
  • Quantities in the right unit
  • Imports cleanly
  • Author and organisation in the header
  • File fingerprint (SHA-256)

We check the technical part. Your contract, the seal or signature and your agency’s policy still decide.

Sample report · Bridge & road alignment · IFC 4.3 ✕Not yetNot as delivered: three things block it, each one on its own. ✕Not valid IFC yet: 638 property set errors ✕Alignment issues: gaps of up to 31.4 cm ✕Interoperability risk: High !Header does not meet the buildingSMART header rules ✓Georeferenced Send back first: close the gaps in 1 alignment, correct the property sets, re-export the file so it reads cleanly Answers✓ No technical blockers! Check carefully✕ Not yet See the bridge’s answer →

From file to balance sheet in three steps

No BIM expertise needed to read the result. Every number comes with a plain-language explanation.

Drop in the IFC file your engineer, architect or contractor delivered. It is fingerprinted on arrival, never modified, and stored and processed only in the region you choose.

Upload a model →

A forensic analysis that goes much deeper than an IFC checker: what will break when the model is reused, how likely it is to import cleanly, and how it compares with peer models.

A carrying amount, useful life and amortisation that follow accounting standards, what raising the data quality would save in operations, and an improvement plan for the model.

Upload screen: a bridge model encrypted and sealed on arrival, with a choice of eight data regions Analysis screen: forensic score, interoperability and usability risks, interoperability risk, benchmark and fit for use Valuation screen: carrying amount and values under IAS 38, IAS 36 and IFRS 13, potential savings and an improvement plan

Built for the people who own the asset

Model data is paid for as part of project costs. Most owners never account for it or budget to maintain it.

Asset owners & public agencies

Know what you received, whether it can be the legal document, and what it's worth.

Finance & audit teams

A defensible basis for recognising and capitalising model data as an intangible asset.

Design & BIM leads

Show clients the quality of what you hand over, backed by an independent audit.

Reporting that fits your accounting framework

Designed to fit the standards your auditor works with: 16 frameworks, public and private sector, in four regions.

Standards for intangible assets, where model data is recognised
International · public sectorIPSASB Conceptual FrameworkIPSAS 21IPSAS 31
International · IFRSIFRS Conceptual FrameworkIAS 38IFRS 13IAS 36
Europe & North AmericaEU Accounting DirectiveRJ 210WOZ, Article 17(2)US GAAP, ASC 350GASB 51
Asia-Pacific & beyondJ-GAAPCAS 6AASB 138UK · Australia · New Zealand · Canada
Executive guide · free PDF The value of BIM data What model data can go on the balance sheet under these frameworks, what it is worth in operation, and how to make the case to finance. Editions for Europe, the US and international. Get the free guide

Buildings and infrastructure

Useful life and value adjust to the type of asset. Infrastructure data can stay useful for up to 50 years. Open a full report on a real IFC file:

3D model of a 527 m curved bridge on piers, with its road alignment
In short✕ 5! 2✓ 1? 2Bridge & road alignmentSome risk when popular software opens itNot yet a valid IFC fileContent well modelled, but poorly defined4 things broken in the fileLines up with our other assetsAlignment is not reliable yetCan’t tell yet if the quantities can be trustedInformation not yet rich enough for the life spanNot yet usable as the legal document (MALD)3 fixes to send back firstOpen In short → Infrastructure · IFC 4.3 Bridge & road alignment 527 × 59 m · 6,893 elements · three alignments checked up to €1.01M potential savings in operation and maintenance over 50 years, the useful life of infrastructure data. Likely range €646k – €1.01M, most likely €826k. Year 1: €0k as delivered, €1k with complete dataYear 2: €13k as delivered, €17k with complete dataYear 3: €14k as delivered, €18k with complete dataYear 4: €27k as delivered, €36k with complete dataYear 5: €28k as delivered, €36k with complete dataYear 6: €42k as delivered, €54k with complete dataYear 7: €42k as delivered, €55k with complete dataYear 8: €57k as delivered, €74k with complete dataYear 9: €58k as delivered, €75k with complete dataYear 10: €73k as delivered, €96k with complete dataYear 11: €74k as delivered, €97k with complete dataYear 12: €91k as delivered, €119k with complete dataYear 13: €92k as delivered, €121k with complete dataYear 14: €109k as delivered, €144k with complete dataYear 15: €109k as delivered, €145k with complete dataYear 16: €127k as delivered, €168k with complete dataYear 17: €127k as delivered, €169k with complete dataYear 18: €146k as delivered, €193k with complete dataYear 19: €146k as delivered, €195k with complete dataYear 20: €165k as delivered, €221k with complete dataYear 21: €166k as delivered, €225k with complete dataYear 22: €186k as delivered, €253k with complete dataYear 23: €187k as delivered, €257k with complete dataYear 24: €207k as delivered, €286k with complete dataYear 25: €208k as delivered, €291k with complete dataYear 26: €230k as delivered, €321k with complete dataYear 27: €231k as delivered, €325k with complete dataYear 28: €253k as delivered, €356k with complete dataYear 29: €254k as delivered, €360k with complete dataYear 30: €277k as delivered, €391k with complete dataYear 31: €278k as delivered, €394k with complete dataYear 32: €302k as delivered, €427k with complete dataYear 33: €303k as delivered, €429k with complete dataYear 34: €328k as delivered, €463k with complete dataYear 35: €329k as delivered, €466k with complete dataYear 36: €355k as delivered, €500k with complete dataYear 37: €356k as delivered, €503k with complete dataYear 38: €384k as delivered, €540k with complete dataYear 39: €385k as delivered, €543k with complete dataYear 40: €413k as delivered, €581k with complete dataYear 41: €414k as delivered, €585k with complete dataYear 42: €444k as delivered, €625k with complete dataYear 43: €445k as delivered, €629k with complete dataYear 44: €476k as delivered, €671k with complete dataYear 45: €477k as delivered, €676k with complete dataYear 46: €509k as delivered, €720k with complete dataYear 47: €511k as delivered, €725k with complete dataYear 48: €544k as delivered, €772k with complete dataYear 49: €546k as delivered, €778k with complete dataYear 50: €581k as delivered, €826k with complete data 10 years: €74k – €117k with complete data20 years: €172k – €271k with complete data30 years: €305k – €477k with complete data40 years: €453k – €709k with complete data50 years: €646k – €1007k with complete data €1.01M Year 11020304050 Data as delivered · €581k Extra if the data were complete · +€246k Range with complete data Open the sample report →
3D model of a critical pump station
In short✕ 2! 5✓ 1? 1Critical pump stationGood chance popular software can open itNot yet a valid IFC fileContent modelled with gaps, but well defined4 things broken in the fileLines up only partly with our other assetsQuantities need a careful lookInformation may fall short over the life spanNot yet usable as the legal document (MALD)1 fix to send back firstOpen In short → Critical infrastructure · IFC4 Critical pump station MEP model · 2,994 elements · published with the owner's permission Forensic BIM score™82 · A Benchmark98th pct Savings potential€267k Quality by dimension Validity100 Structure76 Geometry98 Information79 Consistency86 Open the sample report →
3D model of an 8.4 km rail tunnel with its terrain, vegetation and neighbouring structures, federated in one file
In short✕ 6! 1? 2Rail tunnel, federated modelLow chance popular software can open itNot yet a valid IFC fileContent poorly modelled and poorly defined4 things broken in the fileDoesn’t line up yet with our other assetsCan’t tell yet if the quantities can be trustedInformation not yet rich enough for the life spanNot yet usable as the legal document (MALD)5 fixes to send back firstOpen In short → Infrastructure · IFC4 · federated model Rail tunnel, federated model 8.4 km · 122,490 elements · 104 sub-models in one file Forensic BIM score™37 · D Interoperability riskHigh Carrying amount€61k
  • 422 objects use an IFC2X3 entity that IFC4 does not define
  • 12,369 objects share 5,936 GlobalIds, mostly in the tunnel tubes
  • 1,786 property links carry no property set
Open the sample report →
Buildings Bridges Roads Alignments Rail MEP Structural Prefab Facades Rebar Energy systems Critical infrastructure And more...
Capabilities · 19 badges

Proof of what a model can do. Earned, not claimed.

Awarded automatically when a file clears the bar: no self-reporting, no negotiation. Ask for them in your contract and check them on delivery.

9 of 19earned by the pump station · 4 within reachHover a medal for its ruleSee them in the report →
Trust & validationCan the file be relied on? STEP Valid STEP fileEarned✓STEP syntax valid (buildingSMART)✓IFC schema valid (buildingSMART)✓Header syntax valid (buildingSMART)✓Prerequisites valid (buildingSMART) IFC Real IFCEarned✓Effective proxy share ≤ 10%✓Unclassified proxies ≤ 2% of elements✓Carries effective data✓≥ 30% standard Psets or URI-linked properties CLEAN Clean exportEarned✓Semantic IFC elements✓No duplicate GlobalIds✓No negative quantities✓No spatial structure warnings✓One site CRS GeoreferencedEarned✓Map conversion with a projected CRS bSDD bSDDNot earned✕URI from buildingSMART Data Dictionary (non-IFC) ALIGN Valid alignmentNot earned✕Alignments defined✕Consistent business-to-geometry representation✕Zero warnings and zero layout notes
Data completenessGold at 100%, silver from 90% 100% ClassifiedEarned · Gold✓Classified ≥ 90% (silver) or ≥ 99.5% (gold) 100% Classified + URIEarned · Gold✓Classified + URI ≥ 90% (silver) or ≥ 99.5% (gold) 90%+ MaterialsEarned · Silver✓Materials ≥ 90% (silver) or ≥ 99.5% (gold) 100% Materials + URINot earned✕Materials + URI ≥ 90% (silver) or ≥ 99.5% (gold) 100% 1 to goQuantitiesWithin reach✕Quantities ≥ 90% (silver) or ≥ 99.5% (gold) 100% TypedEarned · Gold✓Typed ≥ 90% (silver) or ≥ 99.5% (gold) 0 Zero proxiesNot earned✕No proxy objects
Fit for useReady for the job you need it for? QTO 1 to goTake-off readyWithin reach✕Quantities ≥ 90%✓Materials ≥ 80%✓No negative quantities✓Length unit defined COORD Coordination readyEarned✓Not invalid (buildingSMART)✓Recognised MVD declared✓One site✓Containment ≥ 95%✓Effective proxy share ≤ 10%✓Geometry on ≥ 98% of elements AI 1 to goAI readyWithin reach✓Classified ≥ 80%✓Informative values ≥ 80%✕≥ 5 effective facts per element✓Typed ≥ 80%✓≥ 30% standard or URI-defined properties✓One site, no duplicate GlobalIds✓Forensic BIM score™ ≥ 60 FM Operations / FMNot earned✕Spaces present✓Classified ≥ 80%✓Typed ≥ 80%✕≥ 5 effective facts per element✓No duplicate GlobalIds ENERGY Energy analysisNot earned✕Spaces present✕Space boundaries present✓Materials ≥ 80% DPP 1 to goProduct passportWithin reach✓Materials ≥ 90%✓Classified ≥ 80%✓Typed ≥ 80%✕≥ 5 effective facts per element
Your showcase Every badge you earn, across every file, on one anonymised page you can share with colleagues and clients. See all 19 capabilities →

A few of our favourite features

A small sample of what's in every report.

Geometry heatmap of the pump station seen from above: pumps, valves and flanges glow brightest

Geometry heatmap

A density map of the model's own triangles, so the heaviest parts jump out.

The curved bridge model in the browser viewer, seen along its length

3D viewer, no plugins

Every model opens in a full WebAssembly viewer in your browser.

Continuity gap Line Transition Arc

Alignment & continuity check

For infrastructure built with IFC4.3 alignments — bridges, roads, rail.

Illustration of the 3D location map: the bridge spans a river valley and joins the roads at both ends, with its footprint and alignments shown and its foundations seen below ground in X-ray

Real-world location view

Georeferenced models placed on a live 3D map at their true coordinates. Switch on the footprint and alignments, snap the model to the ground, or use X-ray to see foundations below the map.

Live buildingSMART validation

Optional, official schema & syntax compliance verification.

AI-ready export

Every metric, formatted to drop straight into your favourite AI chat. We never share your data with an AI service: whether you paste it into one is up to you.

See every check, badge & export →

The numbers are only as good as what's behind them

We'd rather show you a defensible range than a confident-looking guess.

The valuation engine is calibrated from real hour-estimates given by experienced BIM professionals, and tested against a benchmark of thousands of real IFC files — not a single assumption pulled from thin air.

We fit it with regression analysis and Bayesian methods, and we deliberately avoid false precision: every valuation is shown as a range, with its own statistical likelihood, rather than one confident-looking number. Pro users can tune the assumptions behind it — like the average hourly rate — to match their own market.

It's built on a large, continuously tested body of BIM and construction-economics expertise — and it keeps getting re-calibrated as more real models and more expert input come in.

See exactly how we calculate it, where the data comes from, and where we're still improving →

A range, not a single number Low Most likely High
Every valuation comes with its range and how likely it is, so finance can see how much to rely on it.

Ready to find out what your model is worth?

Drop in your IFC file and get a full audit and valuation in seconds.

Examine your IFC file